9 Holyrood House
Client:
Hermes Investment Management

Contract Administrator:
Workman LLP

Programme:
6 weeks

Value:
£90K


Please click to
download a
PDF version

Description:

Open Contracts were instructed to refurbish the ground floor of this building having previously completed the refurbishment of the first floor.

Scope:

The works consisted of a full strip out and refurbishment of the ground floor.

A comfort cooling air conditioning system was installed and new suspended light fittings added. The associated pipework and cabling were laid through new exposed cable trays.

The WC’s and kitchenette were also stripped out. A new tiled surround and kitchen units were fitted to the kitchen area and new sanitary ware was installed to the WC.

An oak engineered wood floor was laid over the whole of the ground floor and the space redecorated.