Client:
Legal & General Property Co

Contract Administrator:
TFT Consultants

Programme:
7 Weeks

Value:
£224,000


Please click to
download a
PDF version

Description:

Open Contracts were appointed to deliver the refurbishment of the 2nd floor at Friary Court following a competitive tender process.

Scope:

The project included the complete strip out of all partitions, ceilings and flooring back to shell. New suspended ceilings were installed with recessed lighting to LG7. New raised access floors were also installed with Electrak power distribution below for future tenant use.

The existing Versatemp air conditioning units and casings were removed and a new VRF air conditioning system installed. The new office space was then decorated.
This Cat A refurbishment was delivered on time and to budget.
For further information on this project, please contact Peter Smith (Director) on 0207 240 7711