The Great Hall
Client:
Hermes Real Estate Management

Contract Administrator:
Jones Lang La Salle

Programme:
10 weeks

Value:
£430,000


Please click to
download a
PDF version

Description:

Open Contracts were appointed to carry out the refurbishment of the 3rd floor and the WC’s at the Great Hall.

Scope:

The works commenced with the strip out of the 3rd floor including all partitioning, ceilings, lighting, carpets, lighting and air conditioning units.

Once stripped out a new suspended ceiling was fitted along with a new raised access floor. The window frames and doors were repaired. New air conditioning and LED lighting was added. The floor was then redecorated and a new carpet was fitted.
The WC’s were also stripped out completely to allow for the installation of new cubicles, toilets, sinks, vanity mirrors and hand dryers.